CASE STUDY 3: Stackable Reelers Project Specification The client required six reelers which met specification of being ‘stackable’. The specific challenge of this brief highlighted that deployment would be from a platform with severe space restrictions. The engineering challenge was to minimise the on-deck footprint during operation so that we could
Bespoke Subsea Deployment Frame
icreation2021-10-25T09:04:39+01:00CASE STUDY 2: HCS has a world-class reputation for manufacturing high quality bespoke reelers but ‘reel’ ingenuity was needed to solve this engineering challenge.
Electric Reelers and Patented Solutions
icreation2021-10-19T09:23:45+01:00CASE STUDY 1: Electric Reelers and Patented Solutions Project Specification HCS offers considerable experience building variable frequency driven reelers. However, our historical projects pre-dating this have been at lower power levels. This project was unique because the umbilical specification in this project brief dictated a drive capacity of 37kW. Inverter drives
